Report examples
See every report before you buy
ScheduleInsight produces ten distinct deliverables from your Primavera P6 or Microsoft Project schedule. Browse full working examples — real-format output, fictional project data — so you know exactly what you are getting.
Every one is a print-ready A4 document built to the same standard: a cover carrying the verdict, a contents page, numbered sections holding the narrative and the graphs, and lettered appendices holding every table — so any figure in the argument can be traced to the activities that produced it without leaving the document.
All report types
£10 per report
Schedule Quality report
A full 18-check DCMA assessment of your programme, scored 0–100, with a critical findings table and plain-language narrative ready to share with your client.
- 18-check quality matrix with pass / warn / fail per check
- Schedule Quality Score (SQS) 0–100 with benchmark context
- Plain-language narrative suitable for senior review
- Self-contained HTML + PDF — yours to send, nothing stored by us
- 8 pages, A4 — full 18-check register appended
Included with Quality report
Programme Assurance Review
A programme acceptance review built on four assessment layers, not one score, with the verdict worded to the contract you select rather than as a generic accept/reject. Cover page, contents, a narrative body with the analysis and graphs, and every table in the appendices — written the way a project controls director would present it.
- Assessed against NEC4, JCT or FIDIC — you choose the form
- Execution readiness: do the phases actually hand off in the logic?
- Completeness: does the programme model the whole job?
- Monte Carlo forecast run automatically — no risk workshop needed
- 21 pages, A4, print-ready — narrative in the body, detail in the appendix
Included with Quality report
Executive Brief
A one-page board-ready narrative distilled from your Schedule Quality findings. Translates technical DCMA results into plain English for project directors and steering committees.
- Non-technical summary of quality assessment
- Risk flags presented in plain language
- Signed and dated for formal circulation
- Included with every Schedule Quality report
- 7 pages, A4 — cover, contents, brief, driver register
£15 per report
Baseline Comparison
Activity-level delay identification between a baseline and an update, with a delay waterfall, critical delay path trace, and concurrent delay assessment. Essential for claims and programme health reviews.
- Net delay calculation and delay waterfall chart
- Critical delay path identification per revision
- Concurrent delay detection and quantification
- Excel appendix with full activity-level delta
- 9 pages, A4 — narrative in the body, registers in 3 appendices
£20 per report
Risk Forecast
A full Monte Carlo risk forecast for your remaining programme, calibrated to your working calendar. Produces P50 / P80 / P90 finish dates, a finish-date probability distribution, a criticality tornado, and a narrative report.
- P50 / P80 / P90 completion dates with duration ranges
- Probability of completing by planned date
- Criticality tornado — top risk drivers ranked
- Working-calendar calibrated (UKCS, construction, custom)
- 9 pages, A4 — driver register and simulation settings appended
£25 per report
Acceleration Plan
Least-cost crashing against a budget, a finish date or a milestone. Produces a ranked compression plan — what to shorten, by how many days, at what cost — and the cost-efficiency curve showing where further spend stops buying time.
- Ranked plan, cheapest days first, with the finish after every step
- Cost-efficiency curve with the point your money stops working
- Parallel critical chains cut together — the spend textbook crashing wastes
- Every assumption printed next to the number it produced
- Markdown and Excel exports, plus a crashed .xer that opens in P6
£40 per report
Trend Analysis
Period-by-period delay tracking across three or more schedule revisions. Shows cumulative delay accumulation, completion-date drift, and the key periods where slippage was introduced.
- Period-by-period delay waterfall across revisions
- Completion-date trend chart over reporting cycles
- Cross-update activity matching and reconciliation
- Consolidated PDF + Excel appendix per revision
- 8 pages, A4 — revision register and attribution appended
£80 per report
Claim Brief
A forensic delay and entitlement analysis produced from a completed Comparison or Trend Analysis. Windows and time-impact methods in accordance with AACE 29R-03, with the concurrency treated explicitly and the order-sensitivity of the result published rather than hidden.
- Three forensic delay methods: TIA, Windows, As-Planned vs As-Built
- Per-window narrative with concurrent delay assessment
- Entitlement summary ready for submission to Employer
- AACE 29R-03 aligned — accepted by major contract forms
- 9 pages, A4 — window register, calculation and provenance appended
£10 per report
Submission report
An owner or PMO acceptance gate for programme submissions. Your configured acceptance rule is applied to the 18-check assessment and returns ACCEPT, ACCEPT WITH COMMENTS or REJECT — with the conditions of acceptance stated so the contractor knows exactly what to correct.
- Configurable rule: minimum score, permitted failures and warnings
- Clear ACCEPT / ACCEPT WITH COMMENTS / REJECT decision
- Conditions of acceptance written out check by check
- The same rule applied to every submission, so verdicts are comparable
- 8 pages, A4 — full gate register and the rule in force appended
£15 per report
CE Programme Impact
A prospective, programme-to-programme assessment of an NEC compensation event's effect on planned Completion. The Accepted Programme is impacted by the event alone and re-run, so the movement can be traced activity by activity rather than argued.
- Movement of planned Completion — the measure the ECC asks for
- Driving path evidenced activity by activity, with float consumed
- Key Dates assessed independently of Completion
- States plainly what it does not decide: entitlement, Prices, concurrency
- 9 pages, A4 — driving path, Key Dates and provenance appended
£80 per report
NEC quotation pack
The programme-evidence element of a clause 62 quotation (Contractor) or a clause 64 assessment (Project Manager). Dual-mode and signable, with the time effect evidenced from the programme and a Defined Cost placeholder left for your estimator to complete.
- Contractor (cl.62) and Project Manager (cl.64) dual mode
- Time effect on Completion, with the driving-path evidence behind it
- Defined Cost placeholder — clearly unfilled, never presented as priced
- Assumption register including any stated under clause 61.6
- 8 pages, A4 — driving path, assumptions and provenance appended
All examples use fictional project data. No real schedule data is used or stored.